The buildings are really starting to take shape as we put the poles in place, level the floors and grade the slopes to help with drainage. It’s been great having our friends Kelli, Matt and Becca working on so many things with us as well as several HFC staff members (look for the HFC t-shirts).

But the big news is that we finally took delivery of the wood donated by Nile Ply. They donated approximately 120 4’x8′ sheets including ceiling board (think thin particle board), 3/16″ plywood and “block board” which is basically furring strips sandwiched between 1/4″ plywood sheets.

The ceiling and ply will be used for interior walls and the block board will be painted and sealed and used for exterior walls.

We still have more wood to buy and we are anxious to heard for Roofings about their donation. We should know something from them by tomorrow.

20120302-150313.jpg

20120302-150326.jpg

20120302-150339.jpg

20120302-150438.jpg

20120302-150446.jpg

20120302-150516.jpg

20120302-150504.jpg

20120302-150554.jpg

20120302-150603.jpg

20120302-150630.jpg